Ideal VLOM (Village Level Operation and Maintenance) design developed keeping in view maintenance problem – can be handled even by women.
Capable of lifting water from depth up to-approx 45 Meters.
Non-corrosive underground components capable of handling corrosive water situation thereby giving longer life.
Light weight uPVC riser pipes; easy installation & inexpensive.
Adjustable handle to suit varying installation depths.
Inter changeable plunger & foot valves; easy to extract without removing riser pipes.
Two options for pedestal design are available:
A) Pedestal for concrete stand
B) Pedestal of India Mark II design with either3 legs mounting or flange mounting arrangement.